Thursday, August 12, 2010

Workday No. 22 "Connected"

We now have an internet connection and a phone number of our very own. If you want to call us our number is 607.319.5078. Hooray!

It was another busy day at FOUND. Our day began with a meeting immediately followed by lunch and then back to painting. I think I can now safely say that painting is finished in the front space (unless someone has a touch-up/second coat party planned for their own booth - not me I promise)! In the hut there are a few spots to hit and a few trim places to touch up. Other that, the walls are done back there and so are the doors!
All of the letters are painted too.
Ceiling tiles in the front room are going up as I type courtesy of Sandy and Pat. Thank you both so much!
Our landlord Mike came by to make a repair on the concrete steps
and he'll be back soon to poor our new central steps.Looks good Mike. Thank you.

Partitions are primed on both sides and ready for paint and installation. Sandy, Ken, and Marnie made a thorough trip through the space and came up with an impressive list of things for our electrician to tackle. Ken spent more time on the top rung of the ladder testing light bulbs while Marnie got up close and personal with the black rubber baseboard molding (and the hateful glue that still lurks there). Me, well I tidied up, washed a LOT of paint brushes, touched up way more spots than I probably should have and caulked more than a few seams.

Headers are good to go now,

and so are the brown walls in the purple floor room.By the way, what do we call this space after we paint the entire floor gray?
Just wondering...

Tomorrow floor prep, soon to be followed on Saturday by
FLOOR PAINTING!